/ by /   / 0 comments

The Light – Cinema & Bowling Alley

Brief Description: Oakes UK completed the technical, in-depth electrical installation in a new build multiplex shell unit for The Light Cinema, including all exposed Containment, LV Distribution network, Lighting, Automated Lighting Control, Small Power, Structured Cabling and Specialist wiring for the Theatre Management System,...
Read More
/ by /   / 0 comments

Polestar – Trafford Center Manchester

Brief Description: Oakes UK completed the design & build M&E installation within a ground floor retail unit in Trafford Center for the exciting new Electrical Car Manufacture Polestar. This included all exposed Containment, LV Distribution, Lighting, Crestron Lighting Control, Small Power, A/C, Ventilation, Plumbing...
Read More
/ by /   / 0 comments

Aqua Sana Center Parcs Longleat Forest

Brief Description: Full rip out, rewire & refurbishment to the wet side of the existing Aqua Sana Spa. This was broken down in 7 x phases to minimise disruption as the site remained LIVE over a 14 month programme. We also undertook a challenging...
Read More
/ by /   / 0 comments

Rajindas Center Parcs Elveden Forest

Brief Description: Full rip out of the complete existing electrical system and replaced with new throughout. This included fitting a new Eaton iLight lighting control system for dali controlled light fittings. We undertook the works whilst the site was open for business. This made...
Read More
/ by /   / 0 comments

Parc Market Center Parcs Longleat Forest

Brief Description: Full rip out of the complete existing electrical system and replaced with new through out within a tight 5-week programme. We also had to set up a temporary shop in a conference room so the shop could continue trading. We undertook the...
Read More
/ by /   / 0 comments

Pottery Center Parcs Longleat Forest

Brief Description: Full rip out of the complete existing electrical system and replaced with new throughout. All works were carried out within a 4 week fitout programme. We undertook the works whilst the Holiday Park was open for business. This made the fit out...
Read More
/ by /   / 0 comments

Hucks Center Parcs Whinfell Forest

Brief Description: Full rip out of the complete existing electrical system and replaced with new throughout. This included fitting a new Eaton iLight lighting control system for dali controlled light fittings. We undertook the works whilst the site was open for business. This made...
Read More
/ by /   / 0 comments

Hucks Center Parcs Elveden Forest

Brief Description: Full rip out of the complete existing electrical system and replaced with new throughout. This included fitting a new Eaton iLight lighting control system for dali controlled light fittings. We undertook the works whilst the site was open for business. This made...
Read More
/ by /   / 0 comments

Leon – Center Parcs Woburn Forest

Brief Description: Full rip out of the complete existing electrical system and replaced with new throughout. This included fitting a new Mode lighting control system for all light fittings. We undertook the works whilst the site was open for business. This made the fit...
Read More
/ by /   / 0 comments

Asda – Selsey

Brief Description: We undertook a complete plant move of an Air Handling Unit and all associated Electrical and BMS Components from its existing location being on the ground floor plant area to its relocated position being a 4M high new steel frame plant deck...
Read More