Aqua Sana Center Parcs Longleat Forest

  • Project: Aqua Sana Center Parcs Longleat Forest
  • Sector: Leisure & Retail
  • Type: Electrical Refurb

Brief Description:

Full rip out, rewire & refurbishment to the wet side of the existing Aqua Sana Spa. This was broken down in 7 x phases to minimise disruption as the site remained LIVE over a 14 month programme.

We also undertook a challenging 48hours shutdown to upgrade and replace the existing HV transformer which was part of the onsite 11kv ring and upgrade and replace LV Panel board within the existing on site sub-station.

This made the fitout and programme challenging with numerous factors to consider, Nevertheless we achieved the tight programme and delivered the project within the budget.